As Coral Gables prepares for an $11.2 million transformation of Ponce Circle Park, members of the city’s Parks and Recreation Advisory Board are pressing for stronger pedestrian protections on the busy streets around the downtown landmark.
The board voted Nov. 12 to ask the city to do everything possible to improve pedestrian signage after a presentation on planned traffic-calming measures. Members questioned whether the improvements would adequately protect people crossing to the redesigned park, particularly near The Plaza Coral Gables.
The discussion highlighted a challenge facing the project: creating a major public gathering place while maintaining the existing traffic pattern around it.
Raised intersections, narrower roads
Public Works Director Hermes Diaz, joining the meeting by Zoom, outlined roadway changes intended to slow vehicles and improve pedestrian visibility without altering traffic circulation.
“We are not changing or modifying traffic flow, but making changes to the geometry to make it easier and safer to navigate for pedestrians,” Diaz said.
A central feature is a raised intersection on the park’s west side at Palermo Avenue, near the Arthur Murray dance studio. Diaz described it as essentially one large speed bump, with the roadway elevated across the intersection to force drivers to slow down.
Similar raised areas are planned on the park’s north and south sides. Portions of the roadway would be narrowed, while textured pavement, including pavers and painted hatching, would alert drivers approaching pedestrian crossings. Diaz also described devices similar to rumble strips in the slip lanes to discourage speeding.
The raised intersections are intended to make pedestrians more visible before drivers reach the crossings, Diaz said. The roadway would retain its two traffic lanes and existing slip lanes.
A difficult corner draws scrutiny
Board member Kirk Menendez, who said he had lived a block from the park for more than six decades, questioned whether the improvements adequately address the southeast corner near The Plaza Coral Gables.
“Most challenging is southeast,” Menendez said, explaining that drivers approaching that area often do not see pedestrians until the last second. “The entrance going into The Plaza… the cars backed up going in is a mess.”
Diaz acknowledged that the improvements would not address traffic volume.
“It’s going to be a significant improvement from what you have now, but the reality is you still have pedestrians and traffic. That is not going to go away,” he said.
Menendez pressed for more visible pedestrian warning signs, saying signs in the area had disappeared after a previous storm and drivers needed clearer reminders to yield.
“We are assuming Miami drivers are going to do the right thing,” he said.
Diaz responded that Miami-Dade County regulates signage in the area and that the city cannot install different types of signs without county approval.
The board also discussed flashing pedestrian lights. Diaz and Community Recreation Director Fred Couceyro said installing them would require design changes, permitting, electrical connections and funding not included in the current budget.
Construction schedule adds pressure
Couceyro cautioned that reopening the design could jeopardize the construction schedule.
The project has undergone years of revisions, and the developer contributing funding toward the park is preparing to break ground in February, he told the board. Changes requiring county approval could delay that start.
The February timetable is a month later than the January construction target the Gazette reported Nov. 11.
“We were getting ready to build this a couple of years ago,” Diaz said, describing the planned improvements as a significant upgrade from existing conditions.
“I do think the city has done an extensive amount of improvements. We can’t just dismiss them,” Couceyro said.
The board nevertheless adopted Menendez’s motion asking the city to do everything possible to improve pedestrian signage. Menendez emphasized protecting residents over preserving the appearance of the surrounding area. Other members expressed confidence that the city would deliver a safe and attractive park.
A new gathering place downtown
The traffic improvements accompany the redesign of Fred B. Hartnett Ponce Circle Park, which architects have described as the city’s future cultural park.
Plans call for an open-air Odeon for performances at the southern end, shaded arcades and walkways, a canopy of trees to buffer visitors from traffic, and Frank Stella’s “Puffed and Inverted Star II” rising from a fountain at the northern end.
The financing package approved in July provides $8.2 million in city funding and $3 million from Ponce Park Residences LLC, an Allen Morris Company affiliate developing the adjacent condominium project. The developer is also responsible for cost overruns beyond the approved amounts.
Residents broadly supported the redesign at a June 1 public meeting, although questions arose about event noise, the sculpture and pedestrian access.
With construction now targeted for February, the board’s request for additional signage leaves city officials to consider whether further pedestrian safeguards can be added without delaying the park’s transformation.










